Industrial site of 100,000m2 with 110,000m3 of fly tipping (including hazardous materials), industrial units and hard standings. A project of 3 phases including stabilising and screening of existing mounds, demolition of warehousing and removal of hardstanding and crushing and sorting into various waste streams. The aim of the project was to re-cycle/ re-use the maximum amount of materials, with the minimum amount of un-useable/contaminated material leaving site. The value of this project was circa £5m.
Location: Burts Wharf, Belvedere, Kent (Phase 1 to 3)